Please choose your service partner:
1
2
3
4
5
deadline 20.08.2025
Messe Düsseldorf GmbH
Suspension(s) installation with ring attachment (in a height of 8 m), 39 mm in diameter, max. permitted load: 50 kg
- Burden per Roof Knot: 50.0 kg
- Hall: 03 04 05 09 10 11 12 13 14
- Diameter: 39.0 mm
93.10 € / PCS
plus any additional costs incurred
deadline 20.08.2025
Messe Düsseldorf GmbH
Suspension(s) installation with ring attachment, 39 mm in diameter, max. permitted load: 50 kg
- Burden per Roof Knot: 50.0 kg
- Diameter: 39.0 mm
95.30 € / PCS
plus any additional costs incurred
deadline 14.09.2025
74.94 € / pc
plus any additional costs incurred
deadline 14.09.2025
100.83 € / pc
plus any additional costs incurred
deadline 20.08.2025
Messe Düsseldorf GmbH
Euro power socket 230 V, 10 A up to 2,3 KW (can be switched off) / (stand / hall)
- Voltage: 230.0 V
- Amperage: 10.0 A
- Power: 2.3 kW
44.70 € / PCS
plus any additional costs incurred
deadline 20.08.2025
Messe Düsseldorf GmbH
Water connection for kitchen, incl. connection of an exhibitor's own sink and water consumption (hall)
677.00 € / PCS
plus any additional costs incurred
deadline 04.09.2025
After consumption
plus any additional costs incurred
deadline 04.09.2025
ISS Integrated Facility Services GmbH
L - Evening running time cleaning from 21 sqm ( for duration of event )
1.25 € / SQM
plus any additional costs incurred
deadline 04.09.2025
On demand
plus any additional costs incurred
deadline 14.09.2025
35.28 € / pc
plus any additional costs incurred
deadline 20.08.2025
Messe Düsseldorf GmbH
CEE socket, (red) 3-pole, + N + E, 400 V, 32 A, up to 20 kW (stand / hall)
- Voltage: 400.0 V
- Amperage: 32.0 A
- Power: 20.0 kW
141.90 € / PCS
plus any additional costs incurred
deadline 20.08.2025
Messe Düsseldorf GmbH
Power connection up to 3.3kW incl. 1 Euro power socket 230V, 10 A (2.3 kW) + 1 fridge power socket 230V, 4 A (0.9 kW) 24-hour operation
- Power: 3.3 kW
192.00 € / PCS
plus any additional costs incurred
deadline 20.08.2025
Messe Düsseldorf GmbH
Power connection up to 7 kW incl. 2 Euro power sockets 230V, 10 A, 2.3 kW + 1 fridge power socket 230V, 4 A up to 0.9 kW, 24-hour operation
- Power: 7.0 kW
316.00 € / PCS
plus any additional costs incurred
deadline 20.08.2025
Messe Düsseldorf GmbH
CEE socket (red) 3-pole, + N + E, 400 V, 16 A, 10,0 kW (stand / hall)
- Voltage: 400.0 V
- Amperage: 16.0 A
- Power: 10.0 kW
86.00 € / PCS
plus any additional costs incurred
deadline 20.08.2025
Messe Düsseldorf GmbH
Wire-rope(s) installation diameter 4mm, on assembled 2-point grid support (order no. 1307)
- Burden per Roof Knot: 50.0 kg
- Diameter: 4.0 mm
31.30 € / PCS
deadline 20.08.2025
Messe Düsseldorf GmbH
Earthing connection for earthing the stand, required for metal stands (stand / hall)
42.00 € / PCS
plus any additional costs incurred
deadline 20.08.2025
Messe Düsseldorf GmbH
Suspension(s) installation with 1 wire rope, 4 mm in diameter, max. permitted load: 50 kg
- Burden per Roof Knot: 50.0 kg
- Diameter: 4.0 mm
126.60 € / PCS
plus any additional costs incurred
deadline 20.08.2025
0.00 € / PCS
deadline 20.08.2025
Messe Düsseldorf GmbH
Type 50 S wire holder with ring nut for wire cables, dia. between 4 and 5 mm, max. load 50 kg/pcs
- Burden per Roof Knot: 50.0 kg
- Diameter: 4.0 mm
29.50 € / PCS
deadline 20.08.2025
Messe Düsseldorf GmbH
Suspension(s) installation with 1 wire rope, 4 mm in diameter, max. permitted load: 50 kg
- Burden per Roof Knot: 50.0 kg
- Diameter: 4.0 mm
124.40 € / PCS
plus any additional costs incurred
deadline 20.08.2025
339.50 € / PCS
plus any additional costs incurred
deadline 20.08.2025
283.00 € / PCS
plus any additional costs incurred
deadline 20.08.2025
137.00 € / PCS
plus any additional costs incurred
{{#if masterValues.discount}}
offer
{{/if}}
{{#if masterValues.soldout}}
SOLD OUT
{{else}}
{{masterValues.orderdeadlineMessage}}
{{/if}}
{{masterValues.supplierName}}
{{masterValues.productName}}
-
{{#each masterValues.productFeatures}}
- {{this}} {{/each}}
{{masterValues.priceFormattedValue}}
{{#if masterValues.showAdditionalCostHint}}
plus any additional costs incurred
{{/if}}
< Back
Continue >
< Back
1
2
...
91
Continue >
< Back
...
...
Continue >
< Back
...
<
Continue >